Our projects
In cooperation with our construction partners, we have already completed many great projects. See what we can also do for you.

Kläranlage Heimboldshausen

On behalf of Spaans Babcock, we extracted the existing steel trough and mortar bed according to worked demolition profile. After Spaans Babcock installed the new slump trough (IT), the mortar was stamped and phased backfilled with Grouttech ConCrete 80 FL.

View the project

Guesthouse Quarter

Commissioned by BC Gasthuiskwartier V.O.F., Gacon provided the floors, walls and ceilings of the basement of the former Groot Ziekengasthuis in ‘s-Hertogenbosch with durable protective coating systems.

View the project

Bicycle shelter at Driebergen-Zeist station area

The supply and installation of approx. 3,000 m2 of floor finish based on Sikafloor-2540 W in RAL 6018 (aisles) and RAL 7004 (islands for the bike racks) and approx. 400 m2 of wall finish based on Sikagard-675 W in RAL 7004. The floor finish was pre-tested for skid resistance and cleanability by DEKRA Rail in accordance with the requirements

View the project

Concrete bridge of front thickener 1 and 2 at RWZI Deventer

Gacon was commissioned by Pannekoek GWW B.V. to apply the MasterSeal 7000 CR system to the concrete bridges of the pre-thickening tanks after levelling the substrate with MasterEmaco concrete repair mortars. Ultra-high-pressure water blasting with a 2500-bar dirt cutter was carried out by Service Group.

View the project