Client: Spanish Babcock
Location: Heimboldshausen
Gacon was commissioned by Spaans Babcock to extract the existing steel trough and mortar bed according to worked demolition profile. After Spaans Babcock installed the new slump trough (IT), the mortar was stamped and phased backfilled with Grouttech ConCrete 80 FL.
Besides the rear casting of a slump trough, the turning in or so-called ‘tub turning’ of a concrete trainer is also a speciality of ours.