Client: Pannekoek GWW B.V.
Location: Deventer
Gacon was commissioned by Pannekoek GWW B.V. to apply the MasterSeal 7000 CR system to the concrete bridges of the pre-thickening tanks after levelling the substrate with MasterEmaco concrete repair mortars. Ultra-high-pressure water blasting with a 2500-bar dirt cutter was carried out by Service Group.